INDUSTRIAL SUPPLIERS

Supplier Directory

Search listed manufacturers’ capabilities, engineering specifications and procurement contacts, and filter by Non-China qualifications, regulatory requirements and check types.

Non-China filter active: ownership/control, manufacturing origin and material origin are all confirmed. Confirm the applicable check scope against buyer-specific requirements.

1 suppliers

Illustrative industrial manufacturing scene
Illustrative manufacturing scene, not a supplier facility

Ta Peng Spring Enterprise Co., Ltd.

Taiwan

Manufacturing processes

spring manufacturing · Custom parts made to your drawings

Manufacturing specialization

Heavy-duty / large springs

Product categories

Precision Spring Manufacturing · Custom Spring Manufacturing · Compression Springs · Extension Springs

Key engineering specifications

Manufacturing wire range: 0.15–12 mm

MOQ 1

Prototype accepted

Materials

Piano wire · Piano Wire · Tungsten wire · Tungsten Wire

Industry experience

Unknown

Non-China supply chain | Verification results

Basis: factory site visit
Ownership & control

Verified

Non-China Ownership & Control

Confirmation method: Site Visit

Manufacturing origin

Verified

Manufactured in Taiwan

Confirmation method: Site Visit

Material supply chain

Verified

Non-China Material Origin

Confirmation method: Site Visit

Latest published attribute update
Recorded qualification date
Not provided
View supplier profile
1 / 1